Understanding the Timeline for a Ground-Up Build: What to Expect from Start to Finish

Building a structure from the ground up is exciting—it’s where dreams turn into foundations, walls, and finally, a fully realized space. But for many property owners, the most common question is: “How long will it take?”

The answer depends on the size, complexity, and location of the project, but understanding each stage of the process can help set realistic expectations and reduce stress along the way.

1. Pre-Construction Planning (1–3 Months)

Before any dirt is moved, a lot happens behind the scenes:

Site Evaluation & Surveying – Determining lot boundaries, soil conditions, and any grading needs.

Design & Architecture – Working with architects to finalize floor plans, elevations, and style.

Permitting & Approvals – Submitting plans to local authorities and securing building permits.

This stage can move quickly if all documents are in order, but can stretch if revisions are needed.

2. Site Preparation & Foundation (1–2 Months)

Once permits are approved, the real physical work begins:

Clearing & Excavation – Removing debris, trees, or existing structures.

Grading – Leveling the site for proper drainage and stability.

Foundation Work – Pouring footings, slab, or basement walls and allowing curing time.

Delays in this phase often come from weather—especially heavy rain or freezing conditions.

3. Framing & Structural Work (1–2 Months)

This is when your project starts to take shape:

Framing Walls & Roof – Installing the skeleton of the building.

Sheathing & Roofing – Closing in the structure to make it weather-tight.

Windows & Doors – Installed toward the end of this stage.

By this point, you’ll be able to physically walk through the spaces and get a true sense of the layout.

4. Mechanical, Electrical & Plumbing (MEP) Rough-Ins (1–2 Months)

Inside the framed structure, crews work on:

Electrical Wiring & Panels

Plumbing Lines & Fixtures

HVAC Ductwork & Systems

These systems must pass inspections before moving to the next phase.

5. Insulation, Drywall & Interior Finishes (2–4 Months)

This is where the space transforms:

Insulation – Adding comfort and energy efficiency.

Drywall Installation & Finishing – Prepping walls for paint.

Flooring, Cabinets, Countertops, Trim – Bringing in the design elements.

This stage is often the most visible for owners, as finishes reflect personal style.

6. Final Touches & Inspections (1–2 Months)

Before handover, contractors complete:

Lighting & Plumbing Fixtures

Paint Touch-Ups

Final Cleaning

Walkthrough & Punch List – Correcting any small issues.

Final Inspections & Certificate of Occupancy


Total Estimated Timeline:

For a typical residential ground-up build: 8–14 months

For larger commercial projects: 12–24 months

Pro Tip: Working with an experienced general contractor who handles scheduling, permits, and quality control can shorten your build time and reduce delays.

If you’re ready to get the ball rolling on your dream home, Roy Construction Inc can guide you from concept to completion—on time and on budget.